Quotation workflow

What should a multi-part road machinery RFQ include?

A request containing twenty photographs and no line numbers can take longer to quote than a larger, organized list. Give each requested part its own row. Keep uncertain numbers visible as uncertain rather than filling the gap with a guessed cross-reference.

Minimum fields per line

  • Item number and requested quantity
  • OEM or existing supplier reference exactly as printed
  • Machine brand, model, serial range and part position
  • Photo or drawing filename that belongs to that line
  • Required destination and target timing, if known

Keep alternatives separate

If genuine OEM and aftermarket options are acceptable, say so. Ask the supplier to label each alternative and show its own lead time and included components. Do not combine a bare component price with another supplier's assembled-kit price.

Resolve exceptions before payment

Some line items will be confirmed by number. Others may need a measurement or a photograph of the connection face. Mark them “pending technical confirmation” and keep them out of the accepted order until reviewed. A short exception list is easier to resolve than a silent substitution buried in the quote.

Close the loop after delivery

Save the final approved list with any corrected numbers. When a part fits, record the machine and assembly. When it does not, keep the packaging and document the difference from the approved reference before installing another item.

Confirm machine-specific limits and procedures with the appropriate service documentation.

WAWhatsApp